Sunday, January 13, 2013

Setting Up


got both hulls inside and leveled up. unfortunately the area with the lowest roof also seems to have the highest floor so less space to work on the cabin top than I had hoped. I also have made up 2 main beams and hope to get one fitted this week prior to another short break. I plan to double check everything with a water level before I fit the beams.

No comments:

Post a Comment