Saturday, April 19, 2014

Spar shop is open!

Started in on the spar as well.  Cut about 5' off the bottom and 3' off the top.  It's a real hodgepodge of various bits all being cobbled together.  I have been "sort of" looking for a better mast for the last two years.  This one will do! Going to paint the top bit orange and stripping the lower to bare metal of all the old cracked paint.  

No comments:

Post a Comment